Eustis Engineering L.L.C. worked closely with Sealevel Construction Inc to perform highly technical and complex dynamic pile testing over water within Bayou Chene. Our dynamic pile testing led to an optimized foundation design using site-specific test results by increasing the supporting load each foundation could withstand. Our collaboration with Sealevel Construction IncAPTIMT. Baker Smith, St. Mary Levee District, and the Coastal Protection and Restoration Authority of Louisiana allowed us to use our geotechnical engineering expertise alongside the design and construction of one of the largest flood control structures of its kind in the United States.

 

https://www.linkedin.com/feed/update/urn:li:share:6950932538764771328?utm_source=linkedin_share&utm_medium=member_desktop_share&utm_content=post